Showing posts with label Indo - US Nuclear deal. Show all posts
Showing posts with label Indo - US Nuclear deal. Show all posts

Thursday, 4 September 2008

Indo US Nuclear Deal (Part-III)

Our Potential and Our Plans

Worldover there are three main accepted methods of fuel generation through nuclear fuel cycle. The fuel transformation in these three methods occurs as follows;
  • Enriched Uranium-232 after fission produces plutonium as the by product.
  • Plutonium obtained as by product is converted to Uranium-233 and enriched plutonium. (Fast breeder technology)
  • Uranium-233 is to be converted to a reusable form. Research is undergoing the world over for perfecting this technology.
Through the deal we plan to import light water reactors (LWR) and plan to use the spent fuel in this stage to launch fast breeder reactors. The deal also provisions for the import of Uranium as India is running short on Uranium resources (ref. Part 2).

The indigenous research going on in India attempts to use the nuclear fuel in three consecutive stages thereby providing more efficiency and is called the three-stage program. India's three stage program plans to utilize the vast thorium resources that we have (approx. 225,000).

According to DAE chairman Anil Kakodkar, the highest breeding ratio in FBRs is achieved with Plutonium-Uranium based metallic fuel is used in the core and Uranium as a blanket. The strategy advocated by the DAE scientists is that of introducing a thorium blanket in the Pu-U fuelled FBR. But Kakodkar says that this has an adverse impact on the doubling time, which will have an adverse effect on the growth of the installed FBR capacity in the initial part of the second stage.

An essence of Kakodkar's proposal is as follows, Since the slow growth based on Pu-U breeders using Plutonium derived from the small indigenous PHWR base of 10GWe would leave an unmet demand of 412Gwe by 2050, the plutonium obtained by reprocessing the spent fuel of the imported 40 GWe LWRs should be used to launch another series of metallic Pu-U breeders whose exponential growth, starting as it does from a larger LWR capacity base, will be able to meet this energy deficit by 2050.

But when is the indigenous breeder technology using metallic fuels expected to mature? Kakodkar says it will be after 3 decades after the introduction of metallic fuel FBRs by 2022. Therefore thorium based technology will have to wait till 2050. It is thus planned so that by 2050, the supply demand curves would have intersected and then we will have ample time to go for thorium based technology as the demand-supply curves will be drifting away much slower once the gap has been closed.
Or in the extreme circumstances we may be self sufficient as much as to abandon the indigenous program.

A differing voice can be heard from Placid Rodriguez, former director of Kalpakkam Indira Gandhi Centre for Atomic Research and a key player in India's development of breeder program. He advocates an early introduction of thorium cycle. The scenario envisaged by Rodriguez is that of deploying both second stage fuel cycle and third stage fuel cycle involving thorium in parallel. This will give a combination of Pu-U breeders (that breed only Pu-239) with Pu-U breeders having a thorium radial blanket in the second part of the second stage (that breed both Pu-239 and U-239) and of U-233 thorium breeders (That will breed U-233) with heavy water if other thermal reactors that use thorium (like AHWRs) towards a self sustaining U-Th cycle in the third stage. This ensures both good growth potential as well as energy security without being tied to imported fuel for lifetime of reactors.
The strategy advocated by Rodriguez, is based on studies conducted by SM Lee of IGCAR. He had looked at four (fissile/fertile) fuel combinations: Pu-239/U-238, Pu-239/Th-232, U-233/Th-232 and U-233/U-238 in the core and using either U-238 or Th-232 as blanket in each of these combinations. Lee showed that on the basis of the 10 GWe PWHR base, launching thorium based FBRs with advanced metallic fuels in parallel with thorium-less U-Pu breeders or with a little lag would achieve the requisite energy growth.

The statements by Kakodkar, who is identified in public mind with India's thorium utilization, that thorium which has all along been hailed as the panacea for our energy security and independence is suddenly found to have nuclear properties that do not allow fast growth in power generation capacity seems like an alibi for Indo-US nuclear deal.

Wednesday, 6 August 2008

Indo-US Nuclear Deal (Part-II)

An Energy Hungry Nation & its Nuclear Energy Scenario


Let’s start with a look at how we obtain our energy today.


India’s Total Installed Capacity: 1, 45,000 MW

Atomic: 2.9%

Coal, Hydrocarbons & Non-Renewable: 64.6%

Hydro power: 24.7 %

Renewable: 7.7 %


Our long term energy policy requires us to find 1300 GWe of energy by the year 2050. According to DAE, if we do not go ahead with the nuclear imports as envisaged by the Indo-US deal, we will be running up a deficit of 412 GWe by 2050. This huge gap in demand will have to be sufficed by additional coal imports which will come up to 1.6 billion tonne. According to a group of scientists of Department of Atomic Energy headed by Anil Kakodkar, if we add up another 40 GWe during the period 2012-2020, this energy deficit could be completely wiped out by 2050. Suppose if we delay the introduction of Light Water Reactors by a decade and import 40GWe during 2022-2030, then by 2050, we will be running up a deficit of 2050. The additional coal imports required will be 0.7 billion tonne in 2050.


Our Reactors

Since we are looking at Nuclear Energy in particular, lets see from which all facilities we obtain our nuclear power and how much.

India's operating nuclear power reactors:

Reactor

Type

MWe net (each)

Commercial operation

Tarapur 1 & 2

BWR

150

1969

Kaiga 1 & 2

PHWR

202

1999-2000

Kaiga 3

PHWR

202

2007

Kakrapar 1 & 2

PHWR

202

1993-95

Kalpakkam 1 & 2 (MAPS)

PHWR

202

1984-86

Narora 1 & 2

PHWR

202

1991-92

Rawatbhata 1

PHWR

90

1973

Rawatbhata 2

PHWR

187

1981

Rawatbhata 3 & 4

PHWR

202

1999-2000

Tarapur 3 & 4

PHWR

490

2006, 05

Total (17)

3779 MWe


Also let us have a glance at the ongoing projects.

India's nuclear power reactors under construction:

Reactor

Type

MWe net (each)

Commercial operation

Kaiga 4

PHWR

202 MWe

end of 2008

Rawatbhata 5 & 6

PHWR

202 MWe

end of 2008, 3/09

Kudankulam 1 & 2

PWR (VVER)

950 MWe

9/2009, 12/09

Kalpakkam PFBR

FBR

470 MWe

2010

Total (6)

2976 MWe


Our Resources

So the immediate doubt will possibly be how India supplies fuel for the currently operational reactors. The combined requirement for all these reactors is 600 tU per year. Our uranium resources are modest, with 54,000 tonnes as reasonably assured resources and 23,500 tonnes as estimated additional resources in situ. Mining and processing of uranium is carried out by Uranium Corporation of India Ltd, a subsidiary of the Department of Atomic Energy (DAE). The main areas of our uranium deposits are located at the following locations.

India's uranium mines and mills - existing and announced

State, district

Mine

Mill

Operating from

tU per year

Jharkhand

Jaduguda

Jaduguda

1967 (mine)

1968 (mill)

175 total from mill

Bhatin

Jaduguda

1967

Narwapahar

Jaduguda

1995

Bagjata

Jaduguda

2008

Turamdih

Turamdih

2003 (mine)

2008 (mill)

190 total from mill

Banduhurang

Turamdih

2007

Mohuldih

Turamdih

2011

Meghalaya

Kylleng-Pyndengsohiong

(Domiasiat)Mawthabah

Mawthabah

2012

340

Andhra Pradesh, Nalgonda

Lambapur-Peddagattu

Seripally

2012

130

Andhra Pradesh, Kadapa

Tummalapalle

Tummalapalle

2010

220


As of mid 2008 Indian nuclear power plants are running at about half of capacity due to a chronic shortage of fuel (as is evident from the over utilization of Jadugada mines. It is currently running at 240tU per year).

Thursday, 31 July 2008

Indo-US Nuclear Deal (Part-1)

There is much furore and fan fare among the great Indian middle and above classes (who are not affected by rising inflation & food shortage) and at the government level on the Indo-US civilian nuclear agreement. It led to many repercussions like the left withdrawing their support to UPA, a photo finish win at the trust votes and easy job for media houses and readers as the central government machinery had to focus only on this issue. As a concerned citizen always interested in India’s strategic movements and an avid observer of the nuclear agreement itself, I have come across a lot of information (and also misinformation) on various aspects related to the agreement, its clauses, IAEA, NSG, 123 agreement, Hyde act, David Mulford, Ronan Sen and his chickens inside and outside the parliament, IPI pipeline and so and so and their implications upon our nation. Needless to say, the bulk of the media are propagating half-truths, partially baked stories and see only one side of the coin. Last week, when I met with my friend Ajay, we had a chit-chat on the issue and his extensive research in the topic clarified many of my doubts and shattered certain misconceptions. Here I would like to explain some of the topics like IAEA, nuclear energy, the 123 agreement, the Hyde act and the likes which are having major bearings on the deal. This is not intended as a debate on whether the deal is required or not, but an explanation of certain technical jargon that may come up in various discussions (so that we know what we are going to speak about before we open our mouths).


Part-1: IAEA & Safeguards Agreement

The International Atomic Energy Agency (IAEA) is an international organization that seeks to promote the peaceful use of nuclear energy and to inhibit its use for military purposes. Though established independently of the United Nations under its own international treaty (the IAEA Statute), the IAEA reports to both the General Assembly and the Security Council. The IAEA has its headquarters in Vienna, Austria. It was established as an autonomous organization on July 29, 1957. The current head of the organization is the Egyptian Mohamed ElBaradei. As of now, there are 144 member states in IAEA. The Board of Governors is one of two policy making bodies of the IAEA. The Board consists of 13 members designated by the outgoing Board and 22 members elected by the General Conference (conference of all member nations).

What concern us about IAEA, is its safeguards. Before we understand what the safeguards are, let us understand the definition of Nuclear Weapons States (NWS) and Non-Nuclear Weapons States (NNWS). NWSs are those nations which conducted their first nuclear test and amassed the weapons technology before 1968, and they are the US, UK, China, France and Russia (or USSR). They are the only nations publicly acknowledged by the world to have nuclear weaponry. NNWS have conducted their tests after this year. Since India conducted her first test in 1974, India is not NWS or she is theoretically NNWS. Now coming to the safeguards agreement; there are three kinds of safeguards, which are;

a. Voluntary safeguards applied to nuclear facilities of NWSs under the nuclear Non-Proliferation Treaty (NPT). For your information, India is not a signatory to NPT citing arguments that it does not provide for arms reduction by NWS and does not curb further tests by them but severely restricts NNWSs.

b. Comprehensive or full scope safeguards system (embodied in the IAEA document INFCIRC/153) for NNWSs under the NPT.

c. Facility/Material/Equipment specific safeguards system (as set out in INFCIRC/66/Rev.2, Sept.1968) for the facilities of non-NPT signatories brought under safeguards either unilaterally or under some bilateral or multilateral agreement.

The implications of these three types of safeguards are respectively as follows;

a) NWSs can classify their reactors as civilian or military and put the civilian reactors under the safeguards as and when they want.

b) All facilities of NNWSs will be under safeguards for perpetuity. Besides these the technology used in these facilities also should be transferred to IAEA for their thorough inspection and study of safety. Everything happening here is accountable to the IAEA.

c) This agreement concerns non signatories of the NPT and any agreement, bilateral or multilateral signed between the states will contain the list of facilities that can be placed under safeguards. These facilities and their technology will be transferred to the IAEA inspectors and the reactors will remain in perpetuity under the safeguards.


The safeguards agreement that will concern India is the third one as we are not a signatory to the NPT. We have three of our reactors under this sort of safeguards- the twin Rajasthan Atomic Power Station (RAPS) according to a bilateral agreement with Russia, Tarapur reactors and the upcoming Kudankulam reactors (again as part of an Indo-Russia agreement).

As part of the Indo-US agreement, both parties are speaking of an India specific safeguards agreement which will be based on the INFCIRC/66 template. The major deviation from the INFCIRC/66 is that this India specific agreement seeks to bring not just one but a set of facilities unilaterally identified by India as civilian, under the safeguards. Further facilities could be annexed to the safeguarded set later.

OK, so much for the safeguards. Now questions time.

1. Why should India add her facilities to the IAEA safeguards when we have many facilities successfully running without being under the safeguards?

The Indo-US agreement is civilian in nature. The fuel/technology/equipment supplied as part of the agreement could only be used for civilian purposes. It should never be used for military (weapons) purpose. To ensure this the facility should be under the safeguards agreement, which will make it in turn answerable to IAEA’s inspection which will/may thwart any attempt to divert the fuel/technology/equipment for non-peaceful purposes.

2. We have nuclear weapons, but why are we still not a NWS?

Theoretically the answer should be; according to the definition NWSs are those that conducted their nuclear tests and amassed nuclear arsenal before 1968. But the actual reason can be- NWS status confers high powers and rights upon us which the other nation(s) might not want us to have. They may even lose the leverage they have on us. Besides it may set a bad precedent as other NNWSs with nuclear weaponry may also demand NWS status.

3. Once a facility of NWS is added to IAEA safeguards, is there any way to pull it out of safeguards?

As of now, after referring all the IAEA, documents, the answer is NO. Oops, there is one. IAEA and host country can jointly determine that the nuclear/non-nuclear material, equipment or component in question has been consumed, is not longer usable for any nuclear activity relevant from the point of view of safeguards or has become practically irrecoverable. In short, that means, the IAEA safeguards wear off once the facility has been decommissioned.


Since there are no further questions that I can conceive of right now, I have decided to move on to the next part. Part-II will deal with India and her rising energy needs.


References:

1. IAEA on Wikipedia

2. Frontline; July 19- August 1, 2008, Volume-25, Number 15